Tameside Wellness Centre Denton
Project Lead Stephen Ravenscroft
Client
WMB Installations. WMB appointed to Design and Build M&E installations for Willmott Dixon on behalf of Tameside Council and Network Space
Appointment
Mechanical, electrical and public health engineering services design completed in REVIT
Project Construction Value
Circa. £11.1million
Description
-
New Leisure centre, designed by Pozzoni Architects, combines leisure, community and wellness facilities all to be managed by Active Tameside
-
8 lane 25m swimming pool with secondary pool
-
10 lane bowling alley
-
50 station gym
-
2 exercise studios
-
Spinning room
-
Thermal suite (sauna and steam room)
-
Community room and soft play centre
-
Other ancillary spaces
-
External car parking and service areas
-
At the heart of the regeneration of Tameside and the town of Denton, backed by a £1.6m grant from Sport England
-
Completed scheme achieved an EPC Rating of B
Duties
Detailed 3D design for mechanical, electrical and public health services to RIBA Stage 5, construction phase monitoring, witnessing of commissioning and assistance in compiling the online O&M manuals linked to the as built 3D model, EPC and BRUKL Production.